On August 27th, Framo Engineering announced that it had received a $100 million contract from A/S Norske Shell and a complete subsea multiphase booster pump system from Draugen Field, Norway.
It is reported that the contract includes a complete set of power and control systems, power and control umbilicals, a complete set of subsea pump modules, etc. The subsea booster pump system will be installed at a water depth of 250 meters and designed to increase oil production. The booster pump system will be assembled and tested at Framo Engineering's new, state-of-the-art facility in Hosoey, Norway, and is expected to be installed in Draugen Field in the summer of 2014.
Customized Medical Blister,Hot-Pressed Paper Blister,Disposable Medical Products Sterile Blister,Disposable Medical Blister Packaging