high Quality Plastic Shopping Basket Mould

Model NO.: RMMOULD78940
Runner: Hot /Cold
Design Software: UG
Installation: Fixed
Standard: HASCO
Customized: Customized
Name: Plastic Shopping Basket Mould
Mould Material: 45#, 50#, P20, H13, 718, 2738, Nak80, S136, SKD61
Mould Base: Lkm, Hasco Ect
Mould Design: 3D/2D Drawing
Design Days: 3 Days
Mould Life: 300, 000-3, 000, 000 Shots
Payment: 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time: 15-60 Days
Trademark: REMO
Specification: International Standard
Origin: Taizhou China
HS Code: 8480719090
Remo is one of the most professional plastic mould manufacturers in China. We are specialized in opening new molds for various plastic products. We have the most advanced technology for dustbin moulds and the most experienced workers for these moulds. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.

The following information will help you understand our molds better.
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.

 
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc

 
Mould Base LKM, HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60 days
                                                                                                                           
Specification depends on customers requirements.
Business Steps
1. R& D We support customers' R& D. We'll make the files or improve the design if you need

 
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get.

 
3. Negotiation The quality, price, material, delivery time, payment item, ect.

 
4. Mould Design 3-5 days for mould and product 3D/2D drawing design

 
5. Mould We will build the mould based on customers' requirements. Before making the mould, we'll send mould design to customers' approval first. Mould will be usually finished in 25-60 days

 
6. Mould Testing When moulds are finished, we will test the moulds to check if it will satisfy consumers' needs. And we will send samples for consumers' reference.

 
7. Sample shoot If the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.

 
8. Delivery Delivery goods by sea or by air, according to customers' requirements.

Our advantages:
1; Excellent Cooling System with extended cooling pipe
2; Copper Cooling for better cooling effects
3; Pre-opening system to improve cycle time
4; Semi-Hot Runner System to save clients cost on moulds
5; Mould Available for recycle Material
6; Excellent control of polish system
7; Weekly report with mould processing photos available
8; Samples and each trial out video available
9; Punctual sample time and delivery time
10; Logistic  service available
11; Engineers available in client's factory for training
12; High quality mould with reasonable price



If you want to know more details, welcome to send an inquiry to us.