Rmtm15-1117856 Plastic Thinwall Bucket Mould / Bucket Mould / Paint Bucket Mould

Model NO.: RMTM15-1117856
Runner: Hot Runner
Design Software: UG
Installation: Semi Fixed
Standard: HASCO
Customized: Customized
Name: Thinwall Bucket Mould
Cavity Numbers: Multi Cavity
Core&Cavity Material: 2316/S136/H13 or Other High Polish Mould Steel
Base Material: 45#
Mould Life: 1,000,000 Under Correct Use
Cycle Time: 10 Seconds
Cooling System: Water Cooling with Fast Coupling
Sample Time: 35-45 Days
Delivery Time: Within 10 Days After Sample Approval
Shipment: Air / Ship
Trademark: REMO
Specification: SGS certificated
Origin: Taizhou China
HS Code: 8480719090
Plastic Thinwall Bucket mould

As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.

Following information is essential for your better understanding on our moulds

Name Description
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc.
Mould Base LKM, HASCO etc.

Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 day
Design Software UG, PROE, CAD, CAE, CAM, CAXA etc.
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA etc.
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step 
1. R& D We support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation  The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design  3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. Mould According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould Testing When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot  If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery  Delivery goods by sea or by air, according  customers requirement 

Vitamin C Ethyl Ether

Vitamin C Ethyl Ether,Ascorbic Acid,Ethyl Ascorbic Acid Ether,Ascorbic Acid Powder

JINGJIANG HENGTONG BIO-ENGINEERING CO.,LTD , https://www.jjhtbio.com