The world's largest environmental pumping room main body completed
Custom Aluminuim Coil,Decoration Coil,Aluminuim Decoration Coil,Aluminuim Clad Laminate Coil Jiangyin Xinren Aluminium Technology Co.,Ltd , https://www.xinrenaluminium.com
The pumping house started construction in April 2010. Different from the general bottom-up construction method, the pumping house adopts a reverse-construction method from top to bottom. According to the technical personnel of China Railway Engineering Bureau of Shanghai Municipal Engineering Company, the entire construction was divided into five reversed operations, and the bottom slab concrete pouring at the bottom of the pump room was finally completed.