Professional Manufacturer Industrial Water Chiller for Injection Mold Machine
AQ-5AC High efficiency Air Cooled Industrial Chiller 2)Low water level alarm and low water temperature alarm 3)Imported compressor from Europe.US and Japan 4)Refrigerating system welded with oxygen free method.to reduce oxides and ensure the smooth surtace 5) Thronle components from Danfoss(Denmark)and Alco(US) 6)SUS304 stainless steel water tank.to avoid corrosion or water leak 7)Stainless Plate,coil,shell and tube or fin type effrcient heat exchange 8)RS485 communication function, to realize automatic management(optional) 9)Electrical devices supplied from OMRON,FUJl,TE,LG.MOELLER and SCHNEIDER 10)Control mode:imported micro-computer or PLC(optional) 11)Perfect safety Protect1on,fatlure display.and not requiring professional personnel for maintenance Highly efficient evaporator and condenser.to save over 30% energy 12)2 compressor heads for over 8AC,for individual or joint operation We guarantee quality and quality first-class, reasonable price, we hope to achieve a win-win situation, to establish long-term friendly business Relation. In strict accordance with ISO 9001:20015 and EN Flanges; En Flanges,En 1092 Flange ,En Flange Stainless,High Quality En Flanges Shanxi Tianbao Group Co.,Ltd. , https://www.tbflange.com
Features
1)High/low pressure protection for the compressor and overheating protection inside the machine
AQWKÂ Â widely used for brewery,beverage factory, food industry, and any other industry which you require low temperature, it is better to be used in high ambient temperature country.
Note: Testing working condition :inlet chilled fluid temperature 12degree C,outlet chilled fluid temperature 7Â degree C; cooling water inlet 30degree C,cooling water outlet 35degree C
details
Certificate
Wooden case package:
Contact me.
Warranty: 2years guarantee, 10years effective and lifetime maintenance
If you have any question,Please Contact me
Tel: +86-574-62501288
Â
Â
Â
Â
1.Make process card and quality plan
2.Choose the qualified raw material and do incoming test, not allowed
nonconforming material to enter into production process;
3.Producing and testing followed the quality documents
4.Be good at Quality records and product identification to ensure the product
traceability
5.Do the final inspection to ensure 100% of pass.