Urumqi Ring Expressway (West Line) Project

Project Title: Development Phase of Urumqi Ring Expressway (West Line): Environmental Impact Assessment Construction Period: First Quarter of 2011 - December 2014

Major equipment: excavators, bulldozers, cranes, road rollers, compactors, mixing towers, pavers, protective panels, explosion-proof blankets, non-magnetic probes, inspection wells, explosive tools vests, police equipment, bayonet, smart Traffic, electronic police, arrest system, radar speed, green facilities, firefighting facilities, lighting facilities, drainage facilities, safety facilities

Project Description:
The project is located on the Ukki link west of Ulabade Interchange, and is connected with the north section of the Toowu Expressway. After 5.03 km eastward, it ends at Ganquanbao Interchange and connects with the East Ring Expressway. The total length of the line is 90.45KM, and two new connecting lines (Suzhou Road and Xishan Road) are built. The length is about 14 kilometers. The proposed project includes the main line and the intercommunication section. Ganquanbao to Liugong Town adopts two-way 8 lanes, and the rest of the road adopts 6-lane highway standard construction. The embankment width is 33.5m. The main projects include 6 bridges, 14 bridges, 6 bridges, 32 passages, 115 culverts, 12 interchanges, 1 reserve, and 2 service areas (Xishan Service Area and Wujia Canal). Service area). The Suzhou Road connecting line is 5.0KM long, the roadbed width is 24.5m, and the road level is grade one; the Xishan Road connecting line (S102~ West Shanxi interchange section is 5.2KM long, the roadbed width is 24.5m, the road grade is grade one; West Shanxi interchange ~S101 section length 3.7KM, subgrade width 12M, highway grade 2). The main control points along the line are Xishan Farm Factory, Xishan Coal Mine, Bayi Iron and Steel Group, Toutunhe Farm, Sanping Farm, Wuyi Farm Factory, villages along Changji City, and villages along the part of Wujiaqu City. The project covers 12,425 acres, including 6,993 acres of arable land, 3,325 acres of wasteland, 74 acres of fish ponds, 2049.08 acres of grassland, 183 acres of house sites, and 122 acres of wetlands.

The total investment of the project is 8.245 billion yuan

Construction Unit: Xinjiang Uyghur Autonomous Region Transportation Construction Administration Postal address: 52 Yan'an Road, Urumqi, Xinjiang Zip Code: 830010
Contact: Satellite phone

Design institute: Xinjiang Uygur Autonomous Region Environmental Protection Technical Consultation Center (EIA)
Postal address: No. 774 Beijing South Road, Urumqi Zip Code: 830011
Contact: Zhang Jianfei Telephone Fax

Related Developments: Tower Crane Infrastructure Project

Bandsaw Machine

Bandsaw Machine,Bandsaw For Sale,Metal Band Saw,Band Saw Machine,Bandsaw Machine Manufacturer

Jiangsu Hoston Machine Tools Co., Ltd. , https://www.haostonmachinetools.com