Three situations where you need to replace the swing arm garbage truck tires

The scorching summer season has removed many hot and irritating seasons, adding to the nuisance of many swing arm garbage truck drivers. The reason is that when the temperature is relatively high, the tire-blasting accidents in various places are gradually increasing, and when it is their turn to be unlucky. In order to prevent the occurrence of a puncture, it is necessary to check the tires that are well- armed garbage trucks and replace them if necessary when they must be replaced.

1. No matter what brand of the wheel is placed on the bottom of the groove of the tread, there is a mark for observation of wear. In general, the degree of wear of the wheel of the swing arm type garbage truck is 1.6 mm, and this mark height is already the minimum groove depth of the legal tire, and the wear level mark of the heavy duty tire is 2.4 mm. Once it is more than the height of these marks, it is sure to be replaced. Some drivers think that the main reason is that tires can continue to be used without major problems. In fact, such thoughts and practices are extremely dangerous if the tires are on a relatively slippery road. The lines on the surface are no way out. The accumulation of water under the tires will result in the loss of control of the vehicle.

2. In the course of using the swing arm garbage truck on weekdays, if the car tire accidentally hits the road with the kan, or is struck by some sharp foreign objects, it will cause the tire to hurt. The common damage conditions of tires include the serious wear of the sidewalls, bulging of the tread, cracks in the tread, multiple tires being tied up by foreign materials, missing rubber in the tread, and so on. If there is a bulge on the tires of the vehicle, there will be a risk of explosion at all times. If the tires of the swing arm garbage truck have the above-mentioned conditions, it is necessary to go to a professional repair shop to carry out repairs or replace them.

3. Even if there are many good driving techniques and cares about the tires of the vehicles, once the tires have been used for a long time, they will all gradually become old. The service life of a wheel is generally about 5 years. If it exceeds this time, the tire will begin to age. If the tire is worn out, the main reason is that there will be cracks and surface hardening, and the aging tire is deformed easily after it loses its elasticity, and a puncture may occur at any time. Therefore, when the vehicle tires have exceeded the service life, it is safer to replace them.

We can supply big range of such bronze Casting Parts, including investment casting and Sand Casting

Sand Casting method (Sand Casting)

Using Sand as Mold material, according to the different components of Sand can be subdivided into wet Sand casting method of Green Sand Mold), surface Dry Sand casting method (Dry Sand Mold), and so on, but not all are available in the casting.

Advantage is lower cost, because the sand mold use reusable;

Lost wax Casting, Investment Casting

This method can be as the outer membrane casting method and the solid casting method.

To copy wax casting items required first, and then into the pool with ceramic and stay dry, make with wax replica is covered a layer of ceramic outer membrane, repeat steps until enough to support outer membrane casting process (about 1/4 inch to 1/8 inch), then the wax melting mould, and out of mold. Then mold need to high temperature for many times, enhance behind the hardness could be used in the casting.

This method has good accuracy, can be used as a high melting point metal, such as titanium casting.

B. Main particulars

MAIN PARTICULARS

Material for product

bronze

Standard

ASTM, ASME, DIN, JIS, ISO, BS, API, EN

Certificate

ISO9001

Dimension

As per drawing, as large as we can

Processing

Step1:investment casting or sand casting

Step2:turning, milling, drilling, grinding, threading, CNC Machining, boring

Finishing surface

Machined surface with oil, blasting and painting, anodize, polishing, powder painting, electrophoretic coating-

Marking

as per clients` requirements

Inspection

material, construction, dimension, heat treatment, hardness, NDT

Quality

ISO9001, PPAP control production

Lead time

20-30 days for sample, consult with customer for mass production

Delivery

Express for sample, ocean shipping/air for mass production

Our Capabilities

CNC machining, CNC center machining, drilling, milling, turning, grinding, tapping, boring

Engineering & manufacturing services

R&D process, tooling and gauging design, product design

Integrated CAD/CAM system, test and measuring

Others

Recyclable, in line with environmental requirements and standards, and reliable


C. Construction

Construction by casting and machining


D Workmanship

The workmanship have good production practice. Care are taken to ensure High accuracy and smooth surfaces 

E. Certificates

- Material certificates

- Measuring reports

- Inspection protocol

- NDT reports

- Fixed certificate: ISO9001 certificate



Our service

Besides above the general specifications, we can also supply some specific machining parts as clients' requirements.


Package and shipping

Export cartons, pallets, wooden cases, Polybags

container package and container transportation

Bronze Casting Parts

Bronze Casting Parts,Oem Bronze Casting Parts,Bronze Sand Casting,Bronze Sand Casting Parts

Shinvast Industry Ltd , http://www.shinvastindustry.com